Solar Panel Replacement and tie-in to Building Utilities

January 21, 2019

 

 

After having completed the original 326 kilowatt solar panel/electrical system utilities tie-in c/w transformer installation, AIM Industrial Multi-Trade was called back in to replace all the panels with new and improved, low-profile units.

This latest job at a major Toronto Manufacturer was completed safely and on time through December and January months.  It's one of a multitude of Solar Projects AIM has carried out since our company inception in 2008 and, it's what we take pride in with our ability to offer and perform such diverse work, all at the highest professional level and standards.

 

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

Honored with 2020 Award from Toyota Canada

November 18, 2020

1/10
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

©2020 by AIM Industrial Inc.