

Replacement of High-Pressure Natural Gas Piping To Three Co-generation (Cogen) Units
Working both inside and out - supplying manpower, tools, equipment and material to our highly-valued customer, in order to replace this...


Design, Procure, Fabricate, Assemble-Delivery of Weld-Water Cooling System to Toyota in the States
In late 2019 AIM Industrial Inc was contracted to provide a turn key weld water cooling system to Toyota Motor Manufacturing in Alabama,...


Solar Panel Replacement and tie-in to Building Utilities
After having completed the original 326 kilowatt solar panel/electrical system utilities tie-in c/w transformer installation, AIM...








































